Here are our more of our commercial projects that we have completed successfully...

Works at the Katherine Bruce Day Nursery included the removal of the existing play equipment, Astroturf & safety matting, existing concrete, razor-wire fencing & climbing plants.

 

Once these works were carried out we installed the new play surface in the play area, refixed planters, Astroturf, safety matting & playing equipment and various concrete repairs.

 

In the final phase of the project, we carried out external decorations to all timberwork, metalwork and play area walls.

 

Project time: 6 weeks                      Date: Aug/Sept 2016

Register Office WC, Chelsea Old Town Hall, London, SW3

WC Refurbishment, Access Self Storage Acton, London, W3

IMG_4172
IMG_4908
G_ItVy-99AGNyUbnAqNQOEo0cgE

The existing toilet facilities are used by various office staff were upgraded to provide  newer & fresher facilities.  

 

Works involved changing the layout of existing layouts, creating new stud walls and rooms including a kitchenette.

 

Including new sanitaryware, flooring, wall tiles and complete re-decorations of interior walls & cubicles.

 

 

Project time: 4 weeks            Date: February 2016

IMG_4532
IMG_5213
IMG_4542
IMG_4929
IMG_4518
IMG_5204
2e_aIMdQpGebVTDRTc-CfgxRHdc
WaKHleZn3l-rPH2tqMHQ9z6Fcdc

The project involved refurbishing the existing WC toilet to bring it up to a modern standard.

 

Works involved to completely remove the existing toilets and the refurbishment included new sanitaryware, floor tiles and complete re-decorations as per the client's specification.

 

Project time: 4 weeks                          Date: March 2016

Katherine Bruce Day Nursery, London, W10

T-JMVG6KENDdv6f8PM_-UqTQ9K8
IMG_7371
IMG_6799
IMG_6798
IMG_7383

Ancill Close, London W6

A collapsed drain under the communal gardens in a local authority housing complex required the complete removal of the existing underground drainage & inspection, trees, pathway and residents garden walls.

 

Works included rebuilding and alignment of the drains & inspection chamber. Upon completion of these works, we rebuilt the garden walls, paved the gardens and applied a new concrete pathway in the external communal area.

 

 

Project time: 4 weeks                      Date: June/July 2016

IMG_6036
IMG_6967
IMG_6037
IMG_6969

Works at St Mary Abbott Church in Kensington, London included the demolition of the existing boundary wall in the Church gardens & school playground.

 

The works involved the installation of a new fence adjacent to the school playground before moving the existing gravestones into new fixed positions and rebuilding of the 54m wall running adjacent to the school playground & church gardens.

 

Upon completion of the rebuilding works, a new fence was installed along the church gardens wall.

 

 

Project time: 16 weeks                      Date: Sept-Dec 2016

St Mary Abbott Church, London, W8

IMG_9206
IMG_9181
IMG_9177
Xc1AuxVpAEbifWL6EJsH7sGL1cg
hfP7YGdfiZpmD42IGVaEuQ4RqRk
lrQbtlQrB__Mrp_uAuRreo8yEkQ

Holland Park Orangery Gallery, London, W11

 

The works at this historic building in West London included:

 

 

•carrying out minor restoration & brickwork repairs,

•repointing & cleaning to the external brickwork,

•repairs to concrete fillets,

•removal of vegetation and applications of defoliant and;

•clearing all of gutters to the main roof.

 

 

 

Project time: 8 weeks                      Date: Sept-Oct 2017

XB1kIPRiqs9wTRNmjS4YsUrcrMc
IMG_1824
IMG_1851
IMG_1841
IMG_1860

Oxford Gardens Primary School Roof, London, W10

 

Works to the main roof at the school involved the cleaning of all yard & drain gullies prior to works & upon completion of works.

 

The main roof works required an Asbestos Specialist to remove the existing roof tiles safely before the renewal works to the pitched roof could commence.

 

During the works, we renewed & redressed all lead flashings and installed new torch-on felt to create a waterproof layer to the roof.

 

Once the main works had been completed, we carried out minor external fabric repairs to the brickwork and carried out water tests to the existing drain gullies.

 

 

 

Project time: 12 weeks                      Date: Jan-Mar 2018

IMG-20180314-WA0074
IMG-20180314-WA0069
IMG-20180314-WA0066
IMG-20180314-WA0077
IMG-20180314-WA0075
K6OkGEudx5mj8iJwELRpTiFXXxk
uO1Gpy_ibqpf9Hjd2olBJwbesmc

Works involved completely to replace existing flooring with a new non-slip vinyl flooring.

 

The works included the removal of the existing WC pan, melamine panels and existing vinyl flooring, fitting a new plywood sub-base and applying a coat of latex screeds ready forthe new flooring.

 

A new Polyflor ‘Polysafe Standard’ non-slip vinyl flooring was laid with the new WC pan & melamine panels re-fitted as per the client’s specification.

 

 

Project time: 2 weeks                      Date: February 2017

Access Self-Storage Wandsworth, SW18 (WC Refurbishment)

IMG_1631
IMG_9449

Works involved removal of existing sanitaryware and fittings, installation of new soil stack & connections to suit the new layout and contained within boxing in.

 

The refurbishment included new sanitaryware, water heater and wall tiles along with new non-slip flooring to meet the client’s specification.

 

 

Project time: 2 weeks                      Date: March 2017

Access Self-Storage Cricklewood, NW2 (WC Refurbishment)

IMG_9472
ABqMlzDJ7sP5uOKF2FVhccxn_Ck

North Sheen Cemetery Chapel, TW9 (Redecorcations & Window Replacement)

REDECORATIONS

 

The works at this Grade 2 listed building included the removal of furniture within the building & protection of the flooring before the works commenced.

 

We prepared all woodwork to ceiling, including exposed timber ceiling beams and timber framework to ceiling panelling before painting the ceiling grills and applied stain varnish to the chapel doors & frames.

 

REPLACEMENT WINDOWS

 

The client specification was to source double glazed units to be fitted in the following locations within the building in Chapel Toilet & Ante Room and these were to match the existing windows sets & architectural design of the building.

 

 

Project time: 4 weeks                      Date: May-June 2017

IMG_0657
IMG_0653
IMG_0555
IMG_0559
o_qKRmaa2UX65kdWy8RpRp8z2Qg
tKwQnW2SdUYTUnwLIqrMmWlFORA

Holland Park Stableyard (Refubishment Works), London, W8

 

The client required works to the roof on one of the Grade 2 listed Stableyard Blocks (Block C) within Holland Park situated in West London.

The works included repairs & renewals of slates to the pitched slate roof, brickwork repairs & repointing, gutter repairs & renewal works and decorations to the entire block.

 

 

Project time: 8 weeks                      Date: July-August 2018

HjOoWZvAd66D3iAlxHKLufXQo4Y
IMG_5351
IMG_5357
IMG_5364

 

Our works to the external basement access ramp involved stripping out the fixtures, fittings & surfaces to existing ramp, installation of new drainage & gullies, large-scale concrete repairs ready to receive client-specified GRP sheeting, minor masonry repairs to brickwork, decorations to all railings & handrails and fitting new LED lighting.

 

Project time: 12 weeks                      Date: June-August 2018

Notting Hill Library (Basement Access Ramp), London, W11

IMG_1022
IMG_1023
TpI0bH7B_IFvKQDolDOkdhwVGJU

Holland Park Greenhouse (Welfare Block & Offices Refurbishment), London, W11

 

The client required works to the existing Welfare Block and office areas inside the Greenhouse within Holland Park situated in West London.

 

The works included the complete damp-proofing to the external walls & floor area, construction of internal blockwork walls, adaptions to existing drainage runs, renewal of all existing sanitaryware to the mens & womens WCS, the installation of new disabled WC facilities, electrical upgrade, installation of LED lighting throughout and installation of new electrical heating.

 

Other works specified by the client’s specification included works to renew existing window frames, full internal decorations to all areas, fitting new flooring throughout and minor roof & gutter repairs.

 

 

Project time: 22 weeks                   Date: July-December 2018

IMG_6400
IMG_6372
IMG_6369
IMG_6362